Cape Town 021 928 2860
   
Cnr of Jan Smuts & Norton road Beaconvale,Parow Cape Town  
Notice: Undefined index: map in /usr/www/users/olympzfemp/wp-content/themes/pearl/partials/header/elements/address/address.php on line 25
Johannesburg 011 205 0357
   
Unit 12, Midline Bussiness Park Cnr Richard Drive Midrand Johannesburg  
Notice: Undefined index: map in /usr/www/users/olympzfemp/wp-content/themes/pearl/partials/header/elements/address/address.php on line 25
0
No products in the cart.

Roofbrite Pure Acrylic Roof Paint is a superior quality Pure Acrylic Copolymer coating for exterior use on fibre cement, concrete, as well as suitably primed metal roofs, and is reinforced with BIODEX a proprietary film fungicide. Roofbrite Pure Acrylic Roof Paint complies with the requirements of SABS 940:1999 Emulsion Roof Paint (Semi Matt). Roofbrite is characterised by having outstanding long-term durability and water resistance, excellent UV resistance, excellent adhesion and local flexibility. Roofbrite may be used on all suitably prepared and or primed roof types.

Prepare the substrate by removing all dirt, grime and loose adherent matter. Cementitious Substrates/Fibre Cement – Apply 1 coat of Roofbrite thinned 10% with water as a primer, 2 coats of Roofbrite as supplied. Metal Substrates – Apply 1 coat Akrotec Metal Primer, and 2 coats Roofbrite as supplied.

Roofbrite is supplied Ready for Use. Thin only as directed. Apply by brush, roller or airless spray, ensuring that there are no air voids generated in application. Roofbrite should not be applied at temperatures below 5deg C, and above 45°C, or above 80% relative humidity, or 2°C above the dew point.

Colour:

Range

Volume Solids:

38%+-1

Drying Time:

2 hours @ 25°C&50%RH

Over coating Time:

4 to 6 hours (if drying time is adhered to per above)

Spreading Rate:

5 to 7 square metres per litre per coat

DFT @ 10 sqm/lt

38 microns

Recommended DFT

100 microns min. (for total system)

Solvent for cleaning: Water

Please be advised that our office will close on Thursday, 20 December for the Festive Season break and will re-open for business on Monday, 07 January 2019. Dismiss